POMERADO HOSPITAL
Emergency Department Renovation
Poway, California

Integrating three distinct components (Emergency Department, Urgent Care and Observation Unit) with individual nurse stations that are supported from a central core (Meds, Dictation, etc.). Each component will flow patients conveniently from one area to the next and each component can go directly to and from the hospital independently without the patient traffic flowing through the adjacent service line.

The project provides 12 emergency bays, 5 observation positions and 4 urgent care spaces.  The new addition will abut the existing facility.  Two separate and distinct entry points are provide for ambulatory patients and emergency (ambulance) patients.

Square Footage:            5,000
Construction Cost:        $1.8 M
Completion Date:           2001

MARIAN MEDICAL CENTER
Emergency Department
Santa Maria, California

This 28-position Emergency Department will be a major component of Marian Medical Center and will offer the following services:

  • 2 Triage Positions

  • 4 Trauma Rooms

  • 22 Exam Rooms

  • 1 Isolation Room (with direct exterior access)

  • 1 GYN Room

  • 1 General Radiology Room

At the center of the plan is a physician dictation area, two nurse stations and a medication area, with the exam/trauma rooms encircling the design's focal point.  The trauma rooms are organized on the opposite side of the ambulance drop-off canopy in order to provide a straightforward, direct access into each trauma room.

Square Footage:            206,000
Construction Cost:        $50 M
Completion Date:           Ongoing

EISENHOWER MEDICAL CENTER
Emergency Department
Rancho Mirage, California

The design team developed a plan, based on user input, to provide a 37-position (currently 21-position) Emergency Department to meet the increase in patient visits.

The plan is organized into two racetrack configurations with the private exam rooms surrounding a central core that is accessible from both sides of the plan diagram.  The four nurse stations are evenly proportioned into the 37 positions for a 12-position/nurse-station ratio.  This arrangement will allow flexibility to open or close a nurse station to meet the fluctuating patient admissions.

Square Footage:            
Construction Cost:         $30 M
Completion Date:            Ongoing